BG Futures Business & Enterprise Centre

  • BG Futures
  • BGUC Futures

The project entailed the major refurbishment and extensions to an existing single-storey unit to create a two-storey extended facility to house 16 start-up business units, including new catering facilities and three conference rooms. An extensive external works package including aesthetically-designed paving and seating areas.

The project was completed over a 52-week period within the heart of the existing campus. The building was designed to achieve an excellent BREEAM rating and incorporated Photo Voltaic cells, solar panels, sun tubes and auto vents to the opening sashes.

All mechanical and electrical systems have been linked into the BEMS system allowing full remote control and monitoring by the campus central facilities department.