The challenges involved in substantially refurbishing the Chantry Building and extending the neighbouring Engineering Block were intensified by the need to undertake the project during term time. The project involved the recladding and reconfiguration of the Chantry Building and the Design and Build of the Engineering Block, including new elevations, roof structure, cladding and internal refurbishment.

By completing major structural work outside of college hours we enabled the buildings to remain operational throughout the project. The site management team liaised closeley with the client to streamline the shared access arrangements with other contractors and ensure safe access for all (thousands of students navigated the site safely during the intense 18 week project).